  • Civil works for the construction of an 18MW Wärtsilä Thermal Power Plant for Jacobsen Elektro in Monrovia, Liberia.

  • Civil, Mechanical and Electrical works for 1xSGT300 and 4xSGT400 Siemens Gas Turbines for Tema Thermal 2 Power Plant in Tema Power Complex, Ghana.

  • Earthworks for the installation of a 350 MW Combined Cycle Gas Turbine (‘CCGT’) Power Plant for Group Five (CenPower) in Kpone (Tema).

  • Haulage of bagged cement for GHACEM from Tema to Akosombo and from Takoradi to Kumasi (Yearly volume of 200,000 tons). Ready-Mix Concrete Batching Plant.
  • Civil and Mechanical installation works of a ready-mix concrete batching plant for JELCEM Ghana in Tema and Accra.  

  • Civil and Mechanical installation works of a ready-mix concrete batching plant for JELCEM Togo in Lome. The project was completed in May 2014.
  • Construction of a 900m3 demineralized water tank for the Tema Thermal Power Complex in Tema
  • Civil works for extension of 33kV Akwatia substation for Jacobsen Elektro AS.
  • Mechanical installation works for 126 MW GE Gas Turbine Plant for Tema-Cenit Thermal Power Project (TCTPP) for GTS Services, Tema. The project was completed in September 2012.
  • Construction of 60-ton gantry crane structures for Tema Thermal (1) Power Plant (TT1PP) for Volta River Authority, Tema. The project was completed in August 2012.
  • Piping works and Mechanical supervision for a 14.4MW USP & E Power Plant for London Mining in Marampa, Sierra Leone. The project was completed in 2011.
  • Civil Works and Construction of Old Koforidua 33 kV substation for Jacobsen Elektro AS. The project was completed in August 2012.
  •  Installation of a gas pipeline and equipment for the Tema Thermal Power Project (2). The project was completed in August 2011.


First Projects Completed:

  • K&H Limited: Effasu Mangyea Power Barge Project for Ansaldo Energy: Installation of a 10-ton gantry crane, fabrication and installation of pipelines for the raw water and demineralized water system.  
  • Wienco Fibers Ltd (Tikobo No.1): Coconut Husk Fiber Factory Project: Installation of a coconut husk fiber processing factory, with a production capacity of six tons of fiber/day. This included the installation of conveyors, crushers, decorticator, (a device used to beat the coconut husk into fibers), motors, screeners, washers, dryer, press and an overhead crane of 12-ton.
  • Takoradi Thermal Power Station (330 MW): Correction of defects of the 330 MW Takoradi Thermal Power Station after its commissioning. Executed professionally and within a short time frame despite various challenges and constraints, this became JVC’s first successful project in the energy sector, hence becoming the hallmark and first milestone of the company.